1702 Housing Structure Update

As of 3/28/14 – Update from the GSMR Shop:

ImageThe concrete work has been progressing nicely despite the numerous delays due to excessive cold and frequent rain storms. All three footer pours have been completed and 100 feet of rail with steel flangeways has been installed and attached to the 18” X 10’ X 100’ footer that runs through the center of the structure. The final concrete pour will consist of the entire floor surface and outer footers. ImageThe weather for this upcoming week looks like it will be cooperating with us and we may have the floor forms and steel reinforcing mesh in place and the floor area ready to be poured. The final pour should take place shortly after that.
Following the floor pour, as soon as the concrete hardens enough to work on, vertical I-beams will be erected and our steam shop will start taking shape for the home of 1702’s rebuild.  

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: