Updates

The guys at the steam shop have been hard at it, as usual. A good majority of the work has been focused on trying to prep and clean for the coming work. Tim and Marshal have been inside the Tender working on the removal of the old layers of epoxy with a needle scaler. In some places the epoxy can be at least a quarter of an inch thick.

Brian has focused on scaling the cylinder and valve body cover, cleaning it up and removing rust.

Joe has been working with the engine lathe making boiler studs and mud rings.

A few various spare parts have been brought into the shop to be lapped and cleaned. Focusing on the blower, Marshal was able to diagram the plan for its rebuild.

The guys were sporting their new Full Steam Ahead t-shirts! Looks like they are pretty proud of them! These brand new shirts hit our merchandise shelves last week and are hot sellers. If you can’t physically make it to our GSMR retail store you can order yours by calling 828-488-5200.

The turntable project is moving along nicely as well. Here is a report from the Project Manager, Tom Falicon:

The contract excavating crew has been working tirelessly and flawlessly to excavate the site. The father and son team are perfectionists and are really producing some fantastic attention to detail work! The approximate depth of the bottom of the turntable pit has been reached. All that is left is to excavate deeper for the outer ring wall and center pivot foundations and structures.

The east slope of the site has been reduced so it will be easier for observers to walk up to the turntable observation area.
An access road has been cleared that will serve as the main access for the steam engine tool/service truck. The road will allow the service vehicles to pull right up alongside the inspection pit with tools and supplies for the servicing of #1702. Silt/mud fencing has been installed around each mountain of dirt and in other key areas. With last week’s rain there were no signs of muddy run-off.

Deep excavation for the concrete structures is well underway and the 19 piles have been cut to their proper height. The re-bar for the center pivot area was delivered last week and the outer ring wall re-bar steel is in Asheville and ready to be delivered as soon as it is needed. The Steel forms for both concrete pours are expected to arrive within the first weeks of May.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: