Turntable Update

Just a quick update from our Project Manager, Tom Falicon on the turntable in Bryson City!

Ties have been installed on the deck of the turntable bridge. The longer ties support walkways so the crews can walk past the engine while it is on the turntable.

100_2567 2016

Short ties have been cut and are being installed under the turntables ring rail.

100_2551_00 2016

A storm water control manhole assembly was installed in order to create a central location for all storm water to be pumped out to a newly excavated retention pond.

100_2580 -2016.jpg 100_2588-2016.jpg

18 cu. yards of concrete was poured into a pit to create a solid base for our locomotive inspection pit to rest on.

100_2590--2016

This month both the precast concrete inspection pit and the precast concrete bridge for the rail passing over the nearby creek will be installed.